Renewable Energy Generation
We are present throughout the entire value chain, from planning to commissioning and maintenance, through the total development and construction of a renewable energy generation asset.
Renewable generation projects
Renewable generation asset under construction
Rules Hydroelectric Power Plant
Own asset
Antonio Valverde Wind Farm
Own asset
Camino de Ácula solar plant
Own asset
Bermejales
Own asset
Guadix Experimental Wind Farm
Own asset
San Lorenzo
Own asset
Wind farm Mamut
Own asset
Cubillas
Assets in operation and maintenance to third parties
Parque Metropolitano Solar
Own asset
La Vega
Own asset
Arquillos
Own asset
Alba de Tormes
Own development
Lorca Project
Own O&M
Bérchules
Complete EPC project
Hoyas Grandes I y II
Complete EPC project
Serrano
The Serrano installation, which will supply around 9,235 MWh of green energy per year, features inverters with maximum power point trackers (MPPT), using insulated gate bipolar transistor computing technology to minimize losses during the inversion process.
- 96,8 GWh average renewable power production
- +27 MWinstalled capacity
- +35 MWof renewable power in O&M
- +1.689 MW of renewable power currently under development
- +210 MW of renewable power developed
The development phase begins with contacting a piece of land and continues until obtaining all the building permits to start the construction phase.
Hydropower
36,2 MW
2%
Wind power
62,9 MW
3%
Solar power
1.268,3 MW
66%
During the construction phase we go from print to reality. Following a 'full EPC' format, we manage to all the phases to ensure that the developing projects are being executed following an absolute standard of safety and quality.
Engineering (E)
Preliminary detail engineering phase for a better definition of every aspect of the construction.
Procurement (P)
Procurement phase considering quality and delivery deadlines.
Construction (C)
Construction and commissioning phase, along with testing and trials, certificates and validations.
Current year EPC projects
Current year EPC projects
![]() | PV Serrano | Finished | Power 4,5 MW | Solar power | Dúrcal (Granada) |
![]() | PV Hoyas Grandes I y II | Finished | Power 11,2 MW | Solar power | Ventas de Huelma (Granada) |
![]() | CH Rules | Finished | Power 4 MW | Hydropower | Vélez de Benaudalla (Granada) |
![]() | CH Arenós | In construction | Power 5,77 MW | Hydropower | Montanejos (Castellón) |
![]() | PE Los Barrancos | Finished | Power 51 MW | Wind energy | Villamena, Escúzar y Alhendín (Granada) |
Specialists in key renewable technologies: hydro, wind and solar photovoltaic.
Hydropower
18,4 MW
17%
Wind power
63 MW
60%
Solar power
24,2 MW
23%
Our third-party O&M-only Projects
Our third-party O&M-only Projects
![]() | PMS | Current O&M | Power 4,6 MW | Solar Power | Escúzar (Granada) |
Bérchules | Current O&M | Power 0,8 MW | Hydropower | Bérchules (Granada) | |
![]() | Salto del Olvido | Current O&M | Power 1,2 MW | Hydropower | Monte de Valsaín, Segovia |
Join our newsletter to be part of the transformation and improvement of the energy sector.
Subscribe and receive a newsletter with energy transformation stories, articles from our experts and free resources. By submitting, you agree to our Privacy Policy. (News in Spanish at the moment)




