Renewable Energy Generation
We are present throughout the entire value chain, from planning to commissioning and maintenance, through the total development and construction of the project.
Own asset
Antonio Valverde Wind Farm
Own asset
Camino de Ácula solar plant
Own asset
Bermejales
Own asset
Guadix Experimental Wind Farm
Own asset
San Lorenzo
Own asset
Wind farm Mamut
Own asset
Cubillas
Own O&M
Parque Metropolitano Solar
Own asset
La Vega
Own asset
Arquillos
Own asset
Alba de Tormes
Own development
Lorca Project
Own O&M
Bérchules













- 96,8GWh average renewable power production
- +32MWinstalled capacity
- +37MWof renewable power in O&M
- +1.630MW of renewable power currently under development
- +137MWof renewable power developed
The development phase begins with contacting a piece of land and continues until obtaining all the building permits to start the construction phase.
Hydropower
42 MW
2%
Wind power
63 MW
3%
Solar power
1.662 MW
95%
During the construction phase we go from print to reality. Following a 'full EPC' format, we manage to all the phases to ensure that the developing projects are being executed following an absolute standard of safety and quality.
Engineering (E)
Preliminary detail engineering phase for a better definition of every aspect of the construction.
Procurement (P)
Procurement phase considering quality and delivery deadlines.
Construction (C)
Construction and commissioning phase, along with testing and trials, certificates and validations.
EPC Projects
![]() | PV Serrano | Under construction | Power 4,5 MW | Solar power | Dúrcal (Granada) |
![]() | PV Hoyas Grandes I y II | Under construction | Power 11,2 MW | Solar power | Ventas de Huelma (Granada) |
![]() | CH Rules | To be built | Power 4 MW | Hydropower | Vélez de Benaudalla (Granada) |
![]() | CH Arenós | To be built | Power 5,77 MW | Hydropower | Montanejos (Valencia) |
![]() | PV Camino de Ácula | Built 2022 | Power 4,8 MW | Solar power | Ácula (Granada) |
![]() | PE Antonio Valverde | Built 2022 | Power 1,5 MW | Wind power | Aldeire (Granada) |
![]() | PEE Guadix | Built 2022 | Power 3,5 MW | Wind power | Aldeire (Granada) |
We design, plan and execute continuous maintenance plans in all our plants, and also to third-parties. Comprehensive, predictive, preventive and corrective plans.
Hydropower
49 GWH/year
51%
Wind power
29 GWH/year
29%
Solar power
20 GWH/year
20%
Our third-party O&M-only Projects
![]() | PMS | Current O&M | Power 4,6 MW | Solar Power | Escúzar (Granada) |
![]() | Bérchules | Current O&M | Power 0,8 MW | Hydropower | Bérchules (Granada) |
We are working to transform and improve the energy sector. Would you like to know more?
Subscribe and receive a newsletter with energy transformation stories, articles on innovation, and tips (only in Spanish at the moment).